BOULEVARD OF THE ALLIES GARAGE MEMBRANE REMOVAL: Removal of urethane membrane system including all trim work and removal of membrane on vertical surfaces.... |
PITTSBURGH AIRPORT MEMBRANE REMOVAL: Removal of membrane system with epoxy topcoat including all trim work and removal of membrane on vertical surfaces around parapet walls, curbs and ... |
TRIMONT TOWERS: Removal of two coats of a urethane membrane including all trim work and removal of membrane on vertical surfaces around parapet walls, curbs and... |
WVU MT LAIR GARAGE: Removal of the epoxy top coated waterproof membrane system for the intermediate level of the West Virginia University Mountain Lair Parking Garage. Using two robotic units and hand lances for the trim work the total removal was completed in 6 day... |
WVU MT LAIR PLAZA: Following removal of the landscaping, the waterproof membrane on the Plaza Level of the Mountain Lair Parking Garage was completely removed using UHP water. One robotic unit and a hand lance for the trim work were used to perform the removal... |