Structure: Bridge Deck
Quantity & Depth of Removal: 3,300 linear feet @ 4.5" to 6" removal
Owner: PA Turnpike
Location: Lackawanna County, PA on turnpike
Contractor: Mosites Construction Company
The Project: Hydrodemolition of a concrete parapet surface to expose the reinforcing steel for a new overlay. A specially designed wall machine for parapets was used for the concrete removal.

