Kennedy Center

Structure:                                              Kennedy Center
                                                            Parking Garage
Removal:                                              Overhead – 29,000 sf @ 4-inches
                                                            Deck – 520,000 sf @ 4-inches                                    
Owner:                                                 National Park Services
Location:                                              Washington, DC
Engineer:                                              Raths, Raths & Johnson
Contractor:                                           Rampart Construction Services, Coraopolis, PA
 
The project involved the removal and replacement of the top 4-inches of concrete on all three parking levels at the Kennedy Center Garage.  In areas where full depth was required the slabs were first hydrodemolished 4-inches from the underside.  The floors were then shored and the top 4-inches was removed.  Any of the 12-inch slab that remained following top and bottom hydrodemolition was removed chipping hammers.  The Center remained open and fully operational during this three-year construction project.  During the hydrodemolition process noise and vibration are not transmitted through the structure allowing the normal operations to continue during the work.  Also, because all the debris is wet there is very little dust associated with the construction, which furthered allowed patrons and employees to use the garage with the normal dust and inconvenience created during a concrete restoration project.
OVerhead hydrodemolition at the Kennedy Center garage
 

Home
Up

Abutment Wall
AZ DOT - Dry Hydro
Bethesda Aqueduct
Canyon Ferry Dam
COOP City Garage
Grandview Platforms
High Speed Scarification
Highway Tunnel Overhead Hydro
Hydro Over Box Beams
ID DOT
Jersey City Viaduct
Kennedy Center
MI DOT - Bridges
NJ DOT - High Strength
OR DOT - Scarification
PA Turnpike Parapit
Water Treatment Plant

    

 

 

 

 

 

    Rampart Hydro Services, LP.   530 Moon Clinton Road. Coraopolis, PA 15108.  Phone 412-262-4511.   Fax 412-262-6188

Our Jets Cruise at 36,000 psi.             WBE Certified.           Ultra High Pressure, Even Higher Standards!

Copyright © 2002-2008, Rampart Hydro Services, L.P., Pittsburgh, PA, U.S.A. All rights reserved