Corner

   Home / About Us / Contact Us / Employment / Seminars / Videos

Corner
    Rampart Logo: Home page link Hydrodemolition trailer Hydrodemoltion tractor and Tracvac Dry Hydrodemolition Hand Lance Work Runway Cleaning Blaster Vacuum Truck Column Cutter

Home | Hydrodemolition | Membrane Removal | Paint Removal | Rubber Removal | Surface Cleaning | Vacuum Services

COOP City Garage

Structure:                                              Parking Garage
Removal:                                              260,000 sf @ 4-inches deep                                          
Owner:                                                 COOP City
Location:                                              Bronx, NY
Engineer:                                              O&S Associates
Contractor:                                           Technical Construction Services, Fort Lee, NJ

Parking Structure was waffle slab construction.  Removal ranged from 3.5 to 4.0 inches to remove the entire dome.  This was a fast pace project that was completed in approximately 6 months.  To meet Technical’s production requirements, Rampart had used up to three hydrodemolition units achieving 7,000 square feet per 10-hour shift.Full depth removal on a waffle slab using hydrodemolition

 

Home
Up

Abutment Wall
AZ DOT - Dry Hydro
Bethesda Aqueduct
Canyon Ferry Dam
COOP City Garage
Grandview Platforms
High Speed Scarification
Highway Tunnel Overhead Hydro
Hydro Over Box Beams
2007 ICRI Longevity Award
ID DOT
Jersey City Viaduct
Kennedy Center
MI DOT - Bridges
NJ DOT - High Strength
OR DOT - Scarification
PA Turnpike Parapet
Water Treatment Plant

    

 

 

 

    Rampart Hydro Services, LP.   530 Moon Clinton Road. Coraopolis, PA 15108.  Phone 412-262-4511.   Fax 412-262-6188

Our Jets Cruise at 36,000 psi.             WBE Certified.           Ultra High Pressure, Even Higher Standards!

Corner

Copyright © 2002-2009, Rampart Hydro Services, L.P., Pittsburgh, PA, U.S.A. All rights reserved

Corner