Home / WBE Certificates / Site Map / Search / Seminars / About Us / Employment Opportunities / Contact Us

   

Home | Hydrodemolition | Membrane Removal | Paint Removal | Rubber Removal | Surface Cleaning | Vacuum Services

Boulevard of the Allies Parking Garage

Structure:                                              Parking Garage
Quantity:                                               22,000 sf (2,050 sm)  Urethane Membrane                   
Owner:                                                 City of Pittsburgh, PA
Location:                                              Boulevard of the Allies in Pittsburgh, PA
Contractor:                                           Carl Walker Construction
                                                            Pittsburgh, PA
Removal of urethane membrane system including all trim work and removal of membrane on vertical surfaces.

Removal of urethane membrane using high pressure water a.k.a. hydrocleaning

Hydrocleaning of membrane on a parking garage.

 

Home
Up

Boulevard of the Allies Parking Garage
Pittsburgh Airport
Trimont Towers
WVU Mt Lair Garage
WVU Mt Lair Plaza

    

 

 

 

 

 

    Rampart Hydro Services, LP.   530 Moon Clinton Road. Coraopolis, PA 15108.  Phone 412-262-4511.   Fax 412-262-6188

Our Jets Cruise at 36,000 psi.             WBE Certified.           Ultra High Pressure, Even Higher Standards!

Copyright © 2002-2008, Rampart Hydro Services, L.P., Pittsburgh, PA, U.S.A. All rights reserved