BASF | Structure: BASF Headquarters Parking GarageQuantity: 332,000 sf (30,850 sm) Owner: BASFLocation: Netcong, NJ Contractor: Architectural Restoration & Waterproofing, Milford, NJSubcontractor: Rampart Hydro ServicesManufacturer: Degusa Chemicals Surface cleaning of 332,000 square feet of the garage deck surface in preparation for the application of a penetrating sealer. UHP water blasting was specified to insure that all cracks were cleaned to allow sealer to penetrate all cracks and provide corrosion protection. 98% of the work was performed using the Surface Master. Hand lances were used to clean around the perimeter. Following the cleaning the deck received a fresh water rinse and allowed to dry prior to the application of the sealer. |
|
| |